Utilizing a portable lithium battery pack, Jabari successfully energized Kijani-9’s legacy diagnostic terminal, decoding the SCADA system event registry. He confirmed that central SCADA software had spoofed a thermal overload at the Gitaru Hydroelectric station.
Cloud-based blueprints issued by central dispatch directly contradicted physical copper relay layouts inside the substation. Mbevi had altered digital schematics so standard utility technicians would fail to resolve the outage using standard operating procedures.
Jabari performed analog resistance tests across primary conductors, verifying that transmission lines suffered zero physical structural damage. The blackout was maintained purely by software-injected lockouts.